PROJECT DETAILS
NOTICE OF COMMENCEMENT OF CONSTRUCTION PROJECT

ADDITIONAL INFORMATION:

Tu Liem Urban Development Joint Stock Company respectfully announces the commencement of construction as follows:

  1. Construction project name: High-rise apartment building at plot NO-11 in the Dich Vong New Urban Area project.
  2. Construction site location: Cau Giay Ward – Hanoi City.
  3. Investor: Tu Liem Urban Development Joint Stock Company.

Address: No. 8 Hoang Tang Bi Street, Dong Ngac Ward, Hanoi City.

  1. Name and contact phone number of the person directly in charge:
Mr : Nguyen Dang Hai
Phone number : 0912 739 700
  1. Scope of the project/construction work:

The land plot designated for the construction of a high-rise apartment building in the Dich Vong New Urban Area Project, designated NO-11, covers an area of ​​approximately 4,641 m². The plot includes one building with 32 floors and 2 basement levels.

  1. Phần Underground (2 floors):
  • Basement Level 1: Floor area approximately 4,641 m²; height 3.5 m ÷ 4.4 m; includes parking areas and technical rooms;
  • Basement Level 2: Floor area approximately 4,641 m²; height 7.2 m; includes parking areas, technical rooms, and water tanks.
  1. Above ground (32 floors):
  • Ground floor: Floor area approximately 1,434m²; height 4.7m; includes reception halls, commercial and service spaces, community activity rooms, and technical/auxiliary rooms;
  • Second floor: Floor area approximately 1,434m²; height 3.6m; includes spaces for a nursery, community activity room, commercial and service spaces, and technical rooms;
  • Third floor: Floor area approximately 1,434m²; height 5.1m; houses gyms, children's play areas, swimming pools, and technical rooms;
  • Floors 4 to 6: Floor area approximately 1,434 m²/floor; height 3.3 m/floor (except floor 6 which is 4.6 m high); layout includes commercial, service, office spaces, and technical rooms;
  • Floors 7 to 32: Floor area approximately 1,373 m²/floor; height 3.3 m/floor; a total of 364 residential apartments (14 apartments/floor);
  • Stairwell: Floor area approximately 381m²; height 3.6m; includes emergency staircases to the roof and technical rooms.
  1. List of main contractors and subcontractors (currently being updated):
Project Management : Tu Liem Urban Development Joint Stock Company (LIDECO)
Construction survey contractor : ACAO Joint Stock Company
Construction design contractor : Paysart Hanoi Co., Ltd.
Paysart Hanoi Co., Ltd. : Institute of Building Science and Technology – IBST
Construction supervision : Tu Liem Urban Development Joint Stock Company (LIDECO)
Construction contractor : Mindipile Foundation Joint Stock Company.
  1. Start date and completion date:
Commencement date : 04/03/2026
Completion date : March 31, 2029 (expected)