Tu Liem Urban Development Joint Stock Company respectfully announces the commencement of construction as follows:
- Construction project name: High-rise apartment building at plot NO-11 in the Dich Vong New Urban Area project.
- Construction site location: Cau Giay Ward – Hanoi City.
- Investor: Tu Liem Urban Development Joint Stock Company.
Address: No. 8 Hoang Tang Bi Street, Dong Ngac Ward, Hanoi City.
- Name and contact phone number of the person directly in charge:
| Mr | : | Nguyen Dang Hai |
| Phone number | : | 0912 739 700 |
- Scope of the project/construction work:
The land plot designated for the construction of a high-rise apartment building in the Dich Vong New Urban Area Project, designated NO-11, covers an area of approximately 4,641 m². The plot includes one building with 32 floors and 2 basement levels.
- Phần Underground (2 floors):
- Basement Level 1: Floor area approximately 4,641 m²; height 3.5 m ÷ 4.4 m; includes parking areas and technical rooms;
- Basement Level 2: Floor area approximately 4,641 m²; height 7.2 m; includes parking areas, technical rooms, and water tanks.
- Above ground (32 floors):
- Ground floor: Floor area approximately 1,434m²; height 4.7m; includes reception halls, commercial and service spaces, community activity rooms, and technical/auxiliary rooms;
- Second floor: Floor area approximately 1,434m²; height 3.6m; includes spaces for a nursery, community activity room, commercial and service spaces, and technical rooms;
- Third floor: Floor area approximately 1,434m²; height 5.1m; houses gyms, children's play areas, swimming pools, and technical rooms;
- Floors 4 to 6: Floor area approximately 1,434 m²/floor; height 3.3 m/floor (except floor 6 which is 4.6 m high); layout includes commercial, service, office spaces, and technical rooms;
- Floors 7 to 32: Floor area approximately 1,373 m²/floor; height 3.3 m/floor; a total of 364 residential apartments (14 apartments/floor);
- Stairwell: Floor area approximately 381m²; height 3.6m; includes emergency staircases to the roof and technical rooms.
- List of main contractors and subcontractors (currently being updated):
| Project Management | : | Tu Liem Urban Development Joint Stock Company (LIDECO) |
| Construction survey contractor | : | ACAO Joint Stock Company |
| Construction design contractor | : | Paysart Hanoi Co., Ltd. |
| Paysart Hanoi Co., Ltd. | : | Institute of Building Science and Technology – IBST |
| Construction supervision | : | Tu Liem Urban Development Joint Stock Company (LIDECO) |
| Construction contractor | : | Mindipile Foundation Joint Stock Company. |
- Start date and completion date:
| Commencement date | : | 04/03/2026 |
| Completion date | : | March 31, 2029 (expected) |

